
Image: Large-scale wood gas CHP unit at the Spanner Re² site
| Project overview - pellet gasifier from Spanner Re² | |
Location: | Unterfranken / Germany |
Electrical power: | 325 kW |
System Engineering: | Wood pellets as fuel, wood gasification using simple fuel technology |
System configuration: | HKA 300 PRO with simple fuel supply from the pellet hopper |
| Fuel: | Wood pellets (standard) |
Special feature: | Reduced peripheral infrastructure due to less conveying equipment and the elimination of the need for timber drying |
Area of application: | Demand-oriented electricity and heat generation using regionally available wood pellets |
| Status: | Overall contract awarded |
| Outlook: | Commissioning expected in winter 2026/2027 |
By employing an innovative combination of industrial pellet gasifiers from Spanner Re² GmbH and a large combined heat and power (CHP) unit, the manufacturing facility is establishing a flexible, CO₂-neutral, and future-proof foundation for its energy supply.
Energy supply with pellet gasifier system for the industry of the future
The energy requirements in plastics and metal processing are demanding: a continuous, reliable supply of electricity for production equipment is just as essential as an efficient heat supply for the facility's infrastructure. The long-established company’s new energy concept addresses both needs simultaneously through the principle of combined heat and power (CHP). At the heart of the new system is an HKA 300 PRO unit, which can be expanded with additional HKA 300 PRO units as needed. Powered by four HV 70 wood-pellet gasifiers from Spanner Re² GmbH, the system generates both electricity and heat from wood pellets. The wood gas produced fuels a high-capacity, large-scale CHP unit, which provides a nominal electrical output of 325 kW. The electricity — produced with high efficiency — is fed directly into the plant’s own supply, powering the energy-intensive machinery used in plastics and metal processing while drastically reducing reliance on the external power grid. Meanwhile, the thermal energy generated in the process is fully utilized to provide climate-friendly heating for the company’s extensive buildings and production halls.
Compact peripheral equipment thanks to wood pellets
Unlike traditional wood gasification systems, which often run on wood chips, this industrial pellet gasification project relies exclusively on wood pellets as fuel. This strategic choice offers significant logistical and structural advantages: Minimized space requirements — the use of standardized wood pellets eliminates the need for large-scale, energy-intensive wood chip drying. Streamlined system engineering — the peripheral equipment required for fuel preparation and storage is substantially smaller. This allowed for the seamless, space-efficient integration of the entire system into the existing facility infrastructure of this medium-sized enterprise.
Flexible, performance-oriented, and future-proof: pellet gasifier from Spanner Re²
Modern industrial facilities require energy systems that can dynamically adapt to fluctuating production cycles. This is where the HKA 300 PRO—an industrial-scale pellet gasification system—truly demonstrates its technological strengths. The system offers flexible, performance-oriented operation: when production is running at full capacity, it generates more electricity precisely when demand within the facility is at its peak. Conversely, during periods of low production or on weekends, its output can be scaled down accordingly. Furthermore, the project offers maximum investment security. Thanks to its modular design, the system can easily be expanded in the future by adding additional HKA 300 PRO units. As a manufacturing operation grows or its level of automation increases, this climate-neutral energy center can simply expand step by step alongside it.
A milestone for the energy transition in industry
Having already set international benchmarks with large-scale, megawatt-range projects — such as a recently commissioned 2 MW wood gasification project in Asia featuring six HKA 300 PRO units — Spanner Re² demonstrates, through this project in the Main-Spessart region, how local medium-sized enterprises are taking concrete action to implement the energy transition. The combination of highly automated industrial pellet gasifiers and modern, large-scale combined heat and power (CHP) technology proves that base-load capability, flexibility, and climate protection are no longer mutually exclusive within the manufacturing industry.
